10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.
These 10 free USCG-AMS questions are organized by exam domain, so you can see how each part of the National Apprentice Mate (Steersman) OC, NC, GL-IN, WR blueprint is tested. Reveal the answer and explanation under each question.
Domain 1: Navigation Rules
Question 1
In clear weather under the International Rules, a tug not engaged in towing sights another power-driven vessel on its port side, crossing with risk of collision. The other vessel makes an early, substantial alteration to pass astern, and successive observations confirm that the maneuver is working. There is ample sea room. What should the tug do while the other vessel completes its maneuver?
Show answer & explanation
Correct answer: B - Maintain course and speed, monitoring until the other vessel is past and clear.
Question 2
Before a nighttime departure into waters where the International Rules apply, the crew checks the lights on a 32 m tug towing an ordinary surface barge astern. The tow measures 235 m from the tug's stern to the barge's after end. The operation does not severely restrict deviation from course. Besides sidelights, a sternlight and a yellow towing light, the tug requires which vertical light group?
Show answer & explanation
Correct answer: D - Three white masthead lights
Domain 2: Deck General
Question 3
A twin-screw towboat moves ahead close to the starboard bank of a straight, narrow channel. Its bow sheers to port while its stern draws toward the bank. Both engines are delivering equal ahead thrust, the rudders follow helm orders, and there is no appreciable crosswind. The paired bow-and-stern motion most strongly indicates:
Show answer & explanation
Correct answer: D - Bank cushion at the bow combined with bank suction at the stern.
Question 4
A tug is secured port side to a straight pier. A current setting from stern toward bow tends to surge the vessel ahead. Which mooring-line lead is specifically suited to checking that ahead movement?
Show answer & explanation
Correct answer: C - From the bow to a bollard farther aft along the pier
Domain 3: Deck Safety
Question 5
An engine-room fire has defeated the initial portable-extinguisher attack. The master orders use of the installed total-flooding CO2 system. The alarm has sounded, everyone is accounted for outside the space, and fuel and machinery have been shut down. Ventilation fans are still running and the ventilation openings remain open. Before releasing CO2, the crew must:
Show answer & explanation
Correct answer: A - Stop ventilation and seal the protected space's openings.
Question 6
A loading comparison holds displacement, KM and uncorrected KG constant. One condition has broad slack tanks with unrestricted liquid surfaces; the other has the tanks either empty or pressed full. Compared with the empty-or-full condition, the slack-tank condition has:
Show answer & explanation
Correct answer: B - Reduced initial stability, because free surface produces a virtual rise in the center of gravity.
Domain 4: Navigation General
Question 7
A marine forecast gives a significant wave height of 6 ft for the tow's offshore route. During the passage, the crew encounters occasional waves noticeably higher than 6 ft. How should the operator interpret the forecast value?
Show answer & explanation
Correct answer: A - It represents the average height of the highest one-third of waves, not a maximum.
Domain 5: Navigation Problems
Question 8
The next leg of a coastal passage requires a true heading of 290°. Local variation is 7° W, and the steering compass has 2° E deviation on the required heading. No allowance for wind or current is needed. Which compass course should be ordered?
Show answer & explanation
Correct answer: C - 295°
Question 9
A tow must pass through a shallow reach and under a fixed bridge. At transit time, the water will be 2 ft above the chart's sounding datum and 1 ft below the bridge's clearance datum. Charted depth is 12 ft; charted bridge clearance is 50 ft. The tow's deepest draft is 11 ft, its air draft is 48 ft, and predicted squat is 0.5 ft. The passage plan requires at least 2 ft under the keel after squat and 2 ft above the tow, with no bridge-clearance credit for squat. No other allowances apply. Which clearance assessment is correct?
Show answer & explanation
Correct answer: A - 2.5 ft under the keel and 3 ft above the tow; both minimums are met.
Domain 6: Towing Vessel Operations
Question 10
An equal-leg towing bridle is re-rigged with a wider angle between its legs. The steady pull along the towing centerline remains unchanged, and the legs still share the load symmetrically. How does widening the angle affect the tension in each leg?
Show answer & explanation
Correct answer: C - It increases because a smaller fraction of each leg's tension acts along the towing centerline.
That's 10 of 1,030
The full bank has 1,020 more USCG-AMS questions with explanations.